Hi, I have a project where our client wants to interconnect using a load side tap / feeder tap. My concern with this is that there is an existing PV system on a breaker in the MSP, up stream from where the feeder tap would be made. The new system would be 30A of backfeed (Load side tap), and the existing system is 30A of backfeed (PV Breaker). This is landing on a 200/200 MSP, which has a 100A breaker for the sub panel feeders, where the new system would be tapped onto.
They are under the 2020 NEC, and I can't figure out if that interconnection would be against any code in 705.12. Some help would be appreciated here, thanks!