I have a Siemens SN series 200 amp load center which is the first point of disconnect. The bonding screw was over torqued and I cannot achieve the 45 in-lb torque spec’d. the screw itself is fine. It is the panel bonding tap hole that is not providing the necessary resistance. Any tips?
Thank you
Thank you