Well maybe they were hedging for a peak load at lunch time when all the microwave ovens come on.Those guys don’t know, plain and simple. They think they do. That’s the problem.e
We have a site with a lot of temporary job trailers.
Designers, architects, job super, etc told us the loading was 2.0MW.
We installed a 2.5MW 480 XF and recorded loading.
So far the highest demand after a year and a half was around 700kW