How do you comply with exception no.1 of 250.32(b)(1), requirement (2) for existing buildings supplied by feeders without an EGC? If you must also install a Grounding Electrode at the panel being supplied by the feeders, wouldn't that always create a continuous metallic path to the grounding system, because you must create one?