Can they not build a bigger septic field?
Also drives cost. I had the same issue. My house has 7 bedrooms. We changed one to an office to make it 6. Our septic system failed and we had two options. Option 1 would support 5 bedrooms and was legal non conforming. Option 2 would support 7 bedrooms, was required to be engineered, would take 5 months to do, and would cost 1.6X Option 1. Option 2 had a larger 2nd tank and larger field than Option 1. We went with Option 1 because we changed one bedroom to an office anyways and the two basement bedrooms don't have legal egress windows which may be grandfathered. I'm happy with advertising it as a 5 bedroom house when we sell because of the septic limits.
 