Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
If there is a 200' run from gear to equipment and they want you to intercept the run at the 150' point(remainder of 50' run being demolished)and reroute the wire down to new equipment how would you pull put that 50' of wire so you can reroute if there's no pull box? We would have to put a pull box to install new conduit drops to the new equipment but before that point we need to pull out the 50' of wire. It's #500's.