iwirehouses
Senior Member
Hello, i have a job where i need to upgrade a service from 150amp to 400 amp (two 200 amp panels 120/240 single phase, underground). Problem is the underground is 282 ft to the pole. The existing service is in a 3” pvc (282 ft) 350mcm feeding 150 amp main breaker. There are also two spare 2”conduits, that i sucked all the water and dead chipmunks out of and are clean and ready. Is there any way to use them to pull conductors 282ft for a 400 amp service? I’d like to pull 300 mcm AL parallel, through the 2”. But at 282 ft, i have a feeling thats not going to be realistic. There is also the three inch thats in use. But i’d imagine id never get those conductors out. There are two 90’s in the pipe runs. Thank you for any advice