Consensus seems to be isolated ground receptacles are obsolete, only to be done if the job specs require it. I was reading through 250.146D. I only see where it is permitted to be ran or spliced (or not), not where it is required to be landed. In an old EC&M article, Mike says it is permitted to be landed to the box immediately with the device. https://www.ecmweb.com/content/article/20890911/the-basics-of-isolated-grounding-receptacles. Can someone direct me to the Code article that might clarify the required termination point?