I got a call from the supervisor at POCO stating that his inspectors were concerned that the main lug meter combo load center I installed did not meet code.
It is a 12 space Eaton MB1212L200BTS
The only breaker installed in it is the one that feeds the service entrance (4 wire) cable
I installed the load center so that the customer would have the option of installing a car charger outside without running circuit back out of the house.
They are concerned that there is no main shut off for the bus located in the meter combo
I figured since everything can be shut off from outside the house it was OK
Not to mention if it was against code, why is it being produced?
Can anyone help to shed some light on how I can go about my next discussion with POCO
TIA
It is a 12 space Eaton MB1212L200BTS
The only breaker installed in it is the one that feeds the service entrance (4 wire) cable
I installed the load center so that the customer would have the option of installing a car charger outside without running circuit back out of the house.
They are concerned that there is no main shut off for the bus located in the meter combo
I figured since everything can be shut off from outside the house it was OK
Not to mention if it was against code, why is it being produced?
Can anyone help to shed some light on how I can go about my next discussion with POCO
TIA