We typically see underground pvc raceways transition to a metal raceway when they emerge from grade either immediately above ground or halfway up with just a short section of metal conduit entering the bottom of the metal subpanel. But is this necessary? The enclosure will rest on the conduit but the conduit itself will not be fully supporting the enclosure. This is inside the wall btw so not exposed to physical damage and you need to run an EGC with the conductors that will bond to the metal enclosures on both ends. So why make the transition and where is this addressed in the NEC?