AC\DC
Senior Member
- Location
- Lucky to know
- Occupation
- EC
I had a client that canceled a estimate on me because their contractor had their own guy look at it and give an estimate and then they called me back like two weeks later and they wanted an estimate and this poopy, stinky, diaper dookie contractor told me the insurance company thought his guy was too high so they he wanted a third-party estimate. This guy is a known shark. I don’t really wanna work with them and they’re doing nothing more than price check. He already got his guy so I wanna politely tell him to stick it.
Last edited by a moderator:
