jeff48356
Senior Member
- Location
- Livonia, Michigan
If upgrading a service panel, I realize that I need to install two ground rods outside, as well as run a ground wire to a cold water pipe, correct? Is there a regulation on where exactly on the pipe that the ground wire should be attached?
Also, is it true that for 100-amp service I need to use #6 copper wire, and if 150 or 200-amp I need to use #4?
For ground rods, is there a regulation on copper vs. galvanized steel, and 1/2" vs. 5/8" with respect to the amperage of the new service being installed?
Also, is it true that for 100-amp service I need to use #6 copper wire, and if 150 or 200-amp I need to use #4?
For ground rods, is there a regulation on copper vs. galvanized steel, and 1/2" vs. 5/8" with respect to the amperage of the new service being installed?