- Location
- Illinois
- Occupation
- retired electrician
There is no equipment grounding conductor between the transformer and the first OCPD. It is a supply side bonding jumper and is sized from Table 250.102(C)(1).Since the EGC will be bonded at the transformer to the grounded conductor, the bonding screw in the panel should be removed, correct?