Can I install a 3phase metercan and set a Fusible disconnect outside a building and then feed a 3 Phase loadcenter (Main lugs) and then from 3 Phase loadcenter sub feed a 2P100 to a 125A (Main Lug) 1 Phase Loadcenter. Would this be Code Compliant. The wire sizes are 2-3/0 ( A,C Phase) 200A Fuses
1-1/0 (B-Phase) 150A Fuses
1-2/0 ( Neutral )
1-1/0 (B-Phase) 150A Fuses
1-2/0 ( Neutral )