We have a 16 hundred amp switch gear, from 200 amp breaker in switch gear it goes to 200 amp sub panel, can I only back feed 40 amps if I tie into sub panel, and if max 40 amp is there another way besides derating and going straight to switch gear
Actually all you need to do is locate the PV system disconnect nearby.