TrickleCharge
Member
- Location
- CA
I have a proposal for design on a hybrid system that includes PV, Batteries, and Gen. Im trying to figure out where the 120% rule plays out in this system per 690.64. I have labeled the points 1, 2, and 3 that I think play into this rule. Number 3 location has the PV feed. Number 2 has 125A breaker that comes from the midnite solar unit (which includes the batteries). The main service is 200A however they are only installting (1) 175A main breaker (this will be the only breaker in this panel. Thanks for the input!