I am in the process of changing out an existing 1200Amp 480/277V, 3Ph, 4W service and replacing with the same size.
In essence the existing service is stand alone 1200a with CT and PT built into cabinet with 1220Amp MCB. We are mounting a new J-box adjacent to the existing J-box to make room to splice the feed thru conductors. The MTS (manual transfer switch) will feed a new 1200amp MCB w/feed thru lugs as shown. This will allow for us to use the new 1200a panel MCB as the means of disconnect so we can prep the new service. The existing will be demolished once the new service is installed.
I will need to coordinate shutdowns with the utility to perform the work. I have attached a overall riser diagram and wiring diagram for reference. I would like your thoughts if the wiring diagram show on E2.0 accurately reflects my intent.
Your thought are most appreciated.
Dan Craven
In essence the existing service is stand alone 1200a with CT and PT built into cabinet with 1220Amp MCB. We are mounting a new J-box adjacent to the existing J-box to make room to splice the feed thru conductors. The MTS (manual transfer switch) will feed a new 1200amp MCB w/feed thru lugs as shown. This will allow for us to use the new 1200a panel MCB as the means of disconnect so we can prep the new service. The existing will be demolished once the new service is installed.
I will need to coordinate shutdowns with the utility to perform the work. I have attached a overall riser diagram and wiring diagram for reference. I would like your thoughts if the wiring diagram show on E2.0 accurately reflects my intent.
Your thought are most appreciated.
Dan Craven