Hey guys so i like be able to turn to this as another set of eyes and opinion.
Im wiring up my first dentist office in Mass.
It was 9 Dentist rooms and a X-ray room plus the front desk and waiting area.
Its a decent place not too huge but also not small.
its already gutted to a point but i do still need to demo electrical because it just hanging everywhere.
i don't need to add any panels because the ones that are there are 200amps and the service is somewhat new.
I priced the job at 35k including materials.
do you think that is too much or too little. should take about 3 weeks to do the rough and 5 days to do the demo. and possibly another week to 2 weeks for finial.
any thoughts ? ideas? or advice? thank you
Im wiring up my first dentist office in Mass.
It was 9 Dentist rooms and a X-ray room plus the front desk and waiting area.
Its a decent place not too huge but also not small.
its already gutted to a point but i do still need to demo electrical because it just hanging everywhere.
i don't need to add any panels because the ones that are there are 200amps and the service is somewhat new.
I priced the job at 35k including materials.
do you think that is too much or too little. should take about 3 weeks to do the rough and 5 days to do the demo. and possibly another week to 2 weeks for finial.
any thoughts ? ideas? or advice? thank you