With this being my first ATS install I'm curious to see what your thoughts are. Or what I might have screwed up
In the end, I went with a 3/0 copper between the service disconnect and ATS as well as from the ATS back to the SER feeding the house panel and #6 copper form the SD to the ATS. From the ATS I used #3 copper along with #8 ground.
The inside house panel will be getting replaced soon and with that, the SER will either be extended or replaced altogether to get rid of the Polaris units. Plus then I can go straight into the ATS from the soffit rather than the current routing which just does not look clean.
https://photos.app.goo.gl/tc1Six5sunfZvgRF8