HELP! I'm replacing an old Federal Pacific 100-amp panel with a 200-amp Square D Hameline panel, so I will need to upgrade the service entrance cable and want to use 2/0 THHN copper. The outdoor meter can/box is mounted low, (30" grade at bottom edge of can) outside, so if we use the bottom rear 2-inch knockout of the meter can, it will put the hole through the wall below the bottom edge of the new breaker panel ( first means of disconnect) by about 8 inches, so I will have to make a vertical 90 upwards turn from hole in wall to bottom knockout of the new panel. I cannot find a 2" close 90 PVC electrical fitting so I'm guessing they don't make one. My question is: how do I make that vertical 90 turn upwards? It will eventually be covered in drywall. Do I need to have the inside copper leads in conduit at all? If I use switch to 4/0 aluminum, do I need conduit inside the wall cavity? thanks in advance!