All,
Tell me what you all think is correct for the given situation.
200amp Service 3-3/0 and a #6 ground from meter to panel. Should that not be a #2 ground as according to table 250.##?? (don't remember what the number is) referring to service grounds. All wire is copper. There is a never ending argument. Please include the proper table # for me too. Thanks in advance all!
Chris Crawford
Oak Ridge, TN
[ July 12, 2004, 03:39 PM: Message edited by: cjcrawfo ]
Tell me what you all think is correct for the given situation.
200amp Service 3-3/0 and a #6 ground from meter to panel. Should that not be a #2 ground as according to table 250.##?? (don't remember what the number is) referring to service grounds. All wire is copper. There is a never ending argument. Please include the proper table # for me too. Thanks in advance all!
Chris Crawford
Oak Ridge, TN
[ July 12, 2004, 03:39 PM: Message edited by: cjcrawfo ]