- Location
- NJ
- Occupation
- Estimator
These are general parameter.
Have a 2" RGS conduit w/ 4#1/0 & 1 #6 THHN going panel to panel.
Run has only 2 bends and is 220' long. with 2 Wall chops.
It is being run hung from T-rod with a conduit clamp.
Ceiling is open and 12' high. Heigh of conduit from floor is about 10'
I has (2) men for 1 week to do this work and my owner said it's taking 2 men 2 weeks.
I think that is long for this work. Any thoughts???
Have a 2" RGS conduit w/ 4#1/0 & 1 #6 THHN going panel to panel.
Run has only 2 bends and is 220' long. with 2 Wall chops.
It is being run hung from T-rod with a conduit clamp.
Ceiling is open and 12' high. Heigh of conduit from floor is about 10'
I has (2) men for 1 week to do this work and my owner said it's taking 2 men 2 weeks.
I think that is long for this work. Any thoughts???