i have a job requiring 200 amp load centers, the previous contractor ran 3" emt to each location from the switch gear. the panels only allow a maximum of a 2-1/2" ko. is there a way to reduce from 3" - 2-1/2" that is permissable by code without purchasing a more expensive panel with a deeper enclosure?
Last edited: