Hi All,
I have a 400 Amp Service and Meter on a pedestal about 150' from our house (it's located here because it's equidistant between the house and a barn).
The plan is to service the house with 200 amps in 3/0 stranded copper. Currently, we have 3" PVC Schedule 40 entering the house below grade through the concrete foundation wall. At the inside of the foundation wall, this transitions to a a 3" PVC LB Conduit Body.
My idea is to locate the 200 Amp subpanel for the house directly above this conduit body, on the main floor of the house, which will make it a ~6' vertical run. I am inclined (maybe even required?) to make this vertical run with 3" RMC.
I think this question has been asked in the forum a few times, but it doesn't seem to be settled.
My questions are:
At what points should I make the RMC transition to the PVC, and using what adapter(s)?
Where should I utilize the threaded end of the RMC, and with what adapter(s)?
What is the most secure way to connect the RMC to the subpanel and support the RMC from its weight bearing down on the PVC Conduit Body?
This is my own house, and we are installing some of the conduit and having our electrician pull the wire and hook up the feeders.
I have a 400 Amp Service and Meter on a pedestal about 150' from our house (it's located here because it's equidistant between the house and a barn).
The plan is to service the house with 200 amps in 3/0 stranded copper. Currently, we have 3" PVC Schedule 40 entering the house below grade through the concrete foundation wall. At the inside of the foundation wall, this transitions to a a 3" PVC LB Conduit Body.
My idea is to locate the 200 Amp subpanel for the house directly above this conduit body, on the main floor of the house, which will make it a ~6' vertical run. I am inclined (maybe even required?) to make this vertical run with 3" RMC.
I think this question has been asked in the forum a few times, but it doesn't seem to be settled.
My questions are:
At what points should I make the RMC transition to the PVC, and using what adapter(s)?
Where should I utilize the threaded end of the RMC, and with what adapter(s)?
What is the most secure way to connect the RMC to the subpanel and support the RMC from its weight bearing down on the PVC Conduit Body?
This is my own house, and we are installing some of the conduit and having our electrician pull the wire and hook up the feeders.
Last edited: