Is it required by the NEC or just good practice to install a 200% neutral for panel feeders where 100% of the load is going to be non-linear in a data center or an "Information Technology Room"? If it is required by the NEC, what section is it in? I've read many posts on this subject and it appears to be good practice/design and not a requirement.