Does 2008 NEC require 4 wires from Service disconnect to feeder panel at seperate location?
Installing meter combo panel at street/transformer location
have ground rod here.
Planning on running URD direct burial to Main feeder panel at house.
2nd ground rod here w/seperated neutal/ground
Do I need to run Quad or triplex?
Also running 60 amp feeder from house panel to pump house.
quad here as well?
Installing meter combo panel at street/transformer location
have ground rod here.
Planning on running URD direct burial to Main feeder panel at house.
2nd ground rod here w/seperated neutal/ground
Do I need to run Quad or triplex?
Also running 60 amp feeder from house panel to pump house.
quad here as well?