A WWTP has a lab drying oven that is rated at 240V + or - 10%, 2.1A.
We've designed a new lab for the wastewater treatment plant.
I have specified to have the electricians install a new 120/208Y panel in the new lab.
There are a couple of 208V, 3 phase new devices spec'd for this new lab and this panel should be able to handle single phase loads as well.
But, will the 208V, 2 phase (2 pole breaker) be sufficient to operate the dryng oven or do I need to go back to the drawing board?
Unfortunatly the panel has been purchased already and this one device was an oversight on my part.
We've designed a new lab for the wastewater treatment plant.
I have specified to have the electricians install a new 120/208Y panel in the new lab.
There are a couple of 208V, 3 phase new devices spec'd for this new lab and this panel should be able to handle single phase loads as well.
But, will the 208V, 2 phase (2 pole breaker) be sufficient to operate the dryng oven or do I need to go back to the drawing board?
Unfortunatly the panel has been purchased already and this one device was an oversight on my part.