steelersman said:I see now, I didn't even notice that it said 120/208, for some reason I thought it said 120/240 and was assuming it was a delta high leg.![]()
Yeah, I wasn't trying to bash anyone but when I open the door to a panel and see every B phase CB missing I assume that the system is 4 wire Delta. When it's actually 208Y/120 then I'm assuming that the guy who wired it didn't even know the system he was working on.