1.) NEC Section/Paragraph: 210.19(A)(3)
2.) Proposal/Comment Recommends: [new text]
3.) Proposal/Comment: Add the following to the end of 210.19(A)(3):
The demand load as calculated in accordance with Article 220 shall be permitted as the maximum load to be served.
4.) Substantiation: Table 220.55, note 4, allows the branch circuit load to be derived from the table. This would clarify the use of the table at the branch circuit level. As this section reads, it could be interpreted two ways; one by the nameplate of the appliance, and the other by Table 220.55 as allowed by that section.
2.) Proposal/Comment Recommends: [new text]
3.) Proposal/Comment: Add the following to the end of 210.19(A)(3):
The demand load as calculated in accordance with Article 220 shall be permitted as the maximum load to be served.
4.) Substantiation: Table 220.55, note 4, allows the branch circuit load to be derived from the table. This would clarify the use of the table at the branch circuit level. As this section reads, it could be interpreted two ways; one by the nameplate of the appliance, and the other by Table 220.55 as allowed by that section.