#8 to me means you can only use pvc underground
Where it says SECs shall not be ran in hollow spaces within framed buildings I assume that means in stud bays?
So basically it has to be surface mounted to the finish surface? Am I interpreting this correctly?
Sent from my SM-G965U using Tapatalk
Where it says SECs shall not be ran in hollow spaces within framed buildings I assume that means in stud bays?
So basically it has to be surface mounted to the finish surface? Am I interpreting this correctly?
Sent from my SM-G965U using Tapatalk