wobblybob
Member
- Location
- Lancaster, Pa, USA

When the GEC is terminated in the meter base and taken down to a ground rod. The main disconnecting means is still bonded say inside the house on the other side of the wall, correct? If there would be a metallic conduit going through would that be creating a parallel path with the neutral there, and create a problem? I’m just trying to understand the procedure when the GEC is landed in the meter base and any variables if any that accompany that.
Sent from my iPhone using Tapatalk