250.20 and 250.21

Isaiah

Senior Member
Location
Baton Rouge
Occupation
Electrical Inspector
Is it possible to have a MV Primary with a MV secondary, delta-delta ungrounded system and still be code compliant?


Enviado desde mi iPhone utilizando Tapatalk
 
Top