I have a question about using schedule 40 vs. schedule 80 for protection of the GEC (2002 NEC 250.64b).
I can?t find anything in 2002 NEC that distinguishes sch. 40 from sch. 80 for protection of the GEC. All it states in 250.64(b) is ?Rigid Nonmetallic Conduit?.
230.50 Changed from ?rigid nonmetallic conduit? in 99 NEC to ?Sch 80 rigid nonmetallic conduit? in 02 NEC.
I don't have a 2005 handy.
erodriguez
I can?t find anything in 2002 NEC that distinguishes sch. 40 from sch. 80 for protection of the GEC. All it states in 250.64(b) is ?Rigid Nonmetallic Conduit?.
230.50 Changed from ?rigid nonmetallic conduit? in 99 NEC to ?Sch 80 rigid nonmetallic conduit? in 02 NEC.
I don't have a 2005 handy.