For those of you under 2008 how are you handling 250.94? Are you mounting a bar on the side of the can, mounting it on the structure?
That is a good way to do it because some electric utilities will not permit anything to be mounted on the meter fitting.With one of these . . .
For those of you under 2008 how are you handling 250.94? Are you mounting a bar on the side of the can, mounting it on the structure?
With one of these
![]()
Enlighten me on this since I am still under the 2002.
We now have to do the cable and phone guys job as they could not do it decently themselves.
![]()
We now have to do the cable and phone guys job as they could not do it decently themselves.![]()
Ah, ok. I see that picture relates to a ground wire not in pipe. In my case all mine are in EMT until terminated at the ground clamp. Once we adopt 2008, how would I achieve this to satisfy code?
I know what you mean....... found this on the panel of one of my jobs.
![]()
I hate those things... and to put it on a square d panel too!
~Matt
For those of you under 2008 how are you handling 250.94? Are you mounting a bar on the side of the can, mounting it on the structure?
I hate those things... and to put it on a square d panel too!
~Matt
I know what you mean....... found this on the panel of one of my jobs.
![]()
I can't believe that those things are designed to go on the cover. So you need to remove the entire apparatus or the ground wire to open the panel. And this is a listed device? There must be a better way.![]()
I can't believe that those things are designed to go on the cover. So you need to remove the entire apparatus or the ground wire to open the panel. And this is a listed device? There must be a better way.![]()
we have had a lot of problems with people cutting ground wires at the house and them at the ground rod so we now run the gec down the inside then out thrue the foundation underground so they wouldn't be cut ...so how sre we going to accomidate this code
Who's in your circle of friends, in Raleigh ?
When does the Board Speak ?