Recently I had to argue with an HVAC tech regarding the placement of pipe or EMT in a fusible disconnect. He said that it was a "72 hour shunt"???? I know and would never put anything but a fuse in place of a fuse. Either way the end result was the package HVAC unit the disconnect was protecting locked up. Both fuses blew and since the pipe didn't "blow" it bypassed the eatery's 400A main and blew the building's 1000A main breaker. No tripped breakers. How many electricians or "techs" do this? And is it at all anywhere acceptable?