timpwilliams
Member
- Location
- Kentucky
I would like to see if someone could settle a disagreement that my employer and I have been having over landing of conductors in a three phase subpanel, or equipment disconnect. The panel from which these paticular loads have been fed also have single phase loads coming out of them, causing the phasing to come out of the panel: "C" "A" "B" or "B" "C" "A" instead of "A" "B" "C". My argument is that it does not matter how it works out, off the circuit breaker, it still should be put back in the subpanel or disconnect "A" "B" "C" . My Employer says if it comes off the breaker "C" "A" "B", it should go back in the subpanel or disconnect the same way. he cannot give me reason behind his thoery. Any Help would be greatly appreciated.
Thanks
Tim
Thanks
Tim