Im will be installing a 120/208 3 phase service in a machine shop. Their is already a single phase 240v service that the man is using a phase converter for his 3 phase needs. He is getting more 3 ph equipment so will need a service to meet the demand.
can I mount a disc swith on the other side of the block wall from the meter? Does it have to be fused? Then come out of the disc sw and feed the existing 3 ph panel that is 40 ft away and presently being fed by the phase converter.
Or do I need to just mount the 3 ph main bkr panel and re wire the branch circuits 40ft back to new panel by meter.
Also their is concrete outside of the wall that the meter will be mounted on.
My next question is about grounding the service. What is the easiest way to ground this new service? Can I use the existing single ph ground or do I need to bust up concrete? What are my options? Any help would be apprecieated.
Thanks.
can I mount a disc swith on the other side of the block wall from the meter? Does it have to be fused? Then come out of the disc sw and feed the existing 3 ph panel that is 40 ft away and presently being fed by the phase converter.
Or do I need to just mount the 3 ph main bkr panel and re wire the branch circuits 40ft back to new panel by meter.
Also their is concrete outside of the wall that the meter will be mounted on.
My next question is about grounding the service. What is the easiest way to ground this new service? Can I use the existing single ph ground or do I need to bust up concrete? What are my options? Any help would be apprecieated.
Thanks.