bnbowen@uiuc.edu
Member
I need to pull a 3 phase, 4 wire, 120/208 volt service to a panel that will power three single phase UPS's and a few smaller single phase non linear loads. Each UPS will feed a single phase panel. All UPS loads will be non linear either 120, 208 or 240 single phase. The UPS inputs will be balanced across all three phases (AB, BC, CA). All MWBC's will have their own neutral.
Do I have to double the neutral on the 3 phase service and on the single phase UPS output panels? Thanks for your help and HAPPY NEW YEAR.
Do I have to double the neutral on the 3 phase service and on the single phase UPS output panels? Thanks for your help and HAPPY NEW YEAR.