Table 300.5 in 2017 is my reference, but I have a sch 40 PVC conduit with 50A 240V circuit. Do to rock and concrete, I can only get this pipe around 10” deep under compacted fine gravel. What are my solutions to meet NEC code? Left side of table 300.5 states 2” of concrete or equivalent, what does NEC define as concrete equivalent? Would 2” of quick Crete and compacted fine gravel be acceptable equivalent?