That’s what I figured was the norm. My only worry is removing the feeders from the meter stack (750MCM). There is a 90 approx 24” under the stack so it’s a tight area. As long as the is the “norm” for retrofitting them I should be ok. I just don’t like having to struggle with thick wire and don’t want to damage it.