PetrosA
Senior Member
- Location
- Lancaster, Pennsylvania
I should have been clearer... I am working on the ASSUMPTION that these are 400A services because the other building with the exact same layout as the one this disconnect is in, has single 400A fuses, but has two disconnects.
You know how you feel really stupid when you do one of those "genius" tests and realize you got it wrong because you missed something obvious? Well, that just happened to me now.
The second building has its service set up totally differently. It has two disconnects, each fused with single 400A fuses and fed with a set of 500 MCM AL USE feeders. That building has a service inspection from 1974. The building these photos came out of has a totally different setup, which may have been wrong from day one. I didn't check when I was there, but I'm wondering whether it even has an inspection sticker on it.
You know how you feel really stupid when you do one of those "genius" tests and realize you got it wrong because you missed something obvious? Well, that just happened to me now.
The second building has its service set up totally differently. It has two disconnects, each fused with single 400A fuses and fed with a set of 500 MCM AL USE feeders. That building has a service inspection from 1974. The building these photos came out of has a totally different setup, which may have been wrong from day one. I didn't check when I was there, but I'm wondering whether it even has an inspection sticker on it.