List,
I'm comming up on a situation that will require one 480 3 phase feed and one 120 volt receptical about 200 feet from the electrical room both voltages are available at. Aside from the extra derate incurred due to adding a 4th current carring conductor, does anyone think this is a code violation?
eastcreek
I'm comming up on a situation that will require one 480 3 phase feed and one 120 volt receptical about 200 feet from the electrical room both voltages are available at. Aside from the extra derate incurred due to adding a 4th current carring conductor, does anyone think this is a code violation?
eastcreek