W wireman71 Senior Member Apr 20, 2008 #21 Thats what I was suspecting. I wouldn't unterminate them hot and reterminate by any means but moving a cable.. : )
Thats what I was suspecting. I wouldn't unterminate them hot and reterminate by any means but moving a cable.. : )
C cornbread Senior Member Apr 21, 2008 #22 Apprecaite the replies. Gives me a lot to think about. IMHO NFPA 70E should address these issues.
J jim dungar Moderator Staff member Location Wisconsin Occupation PE (Retired) - Power Systems Apr 21, 2008 #23 cornbread said: Apprecaite the replies. Gives me a lot to think about. IMHO NFPA 70E should address these issues. Click to expand... Inquiring minds want to know: just what are you doing? Moving insulated cables or unterminating energized conductors?
cornbread said: Apprecaite the replies. Gives me a lot to think about. IMHO NFPA 70E should address these issues. Click to expand... Inquiring minds want to know: just what are you doing? Moving insulated cables or unterminating energized conductors?