There is a 1200A 480V 3 Phase 3 Wire Delta Main Service with a Distribution section.
Are there any NEC Code Section preventing you to feed a 400 Amp 480Y/277V 3 Phase 4 Wire Panelboard off of the 1200A 480V 3 Phase 3 Wire Delta Main Service?
Could you treat the 400A 480Y/277V 3 Phase 4 Wire as a new service new service and drive ground rod at that location??
Are there any NEC Code Section preventing you to feed a 400 Amp 480Y/277V 3 Phase 4 Wire Panelboard off of the 1200A 480V 3 Phase 3 Wire Delta Main Service?
Could you treat the 400A 480Y/277V 3 Phase 4 Wire as a new service new service and drive ground rod at that location??