Davebones
Senior Member
- Location
- North Of Tampa Fl
We are setting up a new Anodize room . I asked the manufacture of the three main control cabinets if they had ground detection for the over the side immersion heaters . His response was that their panels had been UL certified and that UL508 does not require GF on the heater's . Our old anodize tanks were mostly metal and all bonded together while this new room is all plastic polypropylene tanks . Does anyone have any information on whether GFI is required by code or for safety reasons ?