physis: which county? San Mateo, SF, Alameda, Contra Costa. I worked with another EC in SF, Alameda, and CC, and SF was a little different. I found PG&E to be different in each county. In Sonoma, I'd get the new panel inspected, wait for PG&E to energize the new panel, then switch the circuits. i just saw too many outages.
My EC buddy would get the panel inspected and then just use couple taps to switch the feeds, at least in Alameda and CC. he'd ask the homeowner to get the taps back from PG&E. Whether it was formally okay or not, it took the load off PG&E as far as timing, get to it when they could. Sometimes it wouldn't work that way. Then he would tell them that he temporarily jumped from old to new, and let him know when they were going to get to it. He wouldn't let the homeowner go without power.
But I found PG&E variably snotty and snooty. I live in an area where they put those big band locks on, especially where some uppity EC would just pull the meter. I saw my buddy jump the power lines, jump the meter, blank it and then call PG&E and tell them that the guy was getting free power. He had bigger b***s than me.
The world is getting pretty petty sometimes, but be glad you don't work in Sonoma Cty. as it is even pettier.
paul