50/50 vs 100-0-100 generator loading

Status
Not open for further replies.

mbrooke

Batteries Included
Location
United States
Occupation
Technician
Ok, say you've got a site that needs 1000kw of power. Would it be better to purchase two 1000kw gensets running each at 500kw (1000kw for the failure or service of the other) or purchase 3 500kw gensets using one as a spare for service or failure of the other two?

Or simpler way to view it: two 1000kw gensets in parallel or three 500kw gensets in parallel. 1000kw load.


Two schemes- can't make up my mind which is better or why. Help.
 