It is from basement up to first floor. Was going to look for tugger. Do you think it possible to pull by man power?
Why? You have me confused since the o\pull is from the basement to the first floor it would appear that tje pull is no 90 feet vertical.I would use a tugger and pull up. Dropping six-3/0's-90' would require some kind of brake at the top to hold back the weight.
So, a 30' rise x 6 conductors x 2 lbs. per foot (approx.) = 360 lbs of wire to be lifted when pulling up. You also have to overcome friction and that physics law that says things at rest tend to stay at rest.
A tugger can do it easily, but if you can set up a pulley, 3 guys (probably 2) on a rope should be able to handle it. You will probably need 2 in the basement too.
The code allows 8 3/0 in 2.5" Emt I want to pull 6, Existing run, time will be very tight. Pulling out old 2/0 pulling in new 3/0 Would you do it? Or would you increase pipe size. Thanks
Whats the load that is going to applied to these 3/0's?
Just curious why there are 6 in the run?
Why? You have me confused since the o\pull is from the basement to the first floor it would appear that tje pull is no 90 feet vertical.
Whats the load that is going to applied to these 3/0's?
Just curious why there are 6 in the run?
3/0 THWN is 574lb per 1000ft. So 30 feet of 6x 3/0 THWN is only 103lb give or take.