today i got the answer i was knew, old electrical contractor mess up, he should it run conduits straigt to POCO, now i guess i will have to contact Power company to see if they allow a live gutter in the electrical room and i guess i will bond every unit at its meter outside.
Well check with the electrical inspector too, as you still have 230.3 to deal with, as mentioned before - you better have a really good pastry on hand