I am pricing a service reconfiguration in a strip mall. The existing service is 600A into a CT cabinet with MCB, then is distributed out from there. The space is being subdivided, so they hired an engineer to reconf the service. The engineers' drawing has the service lateral (parallel 350's)entering into a 12x12 trough, then tapping off to (3) 200A meters and disconnects. My question concerns grounding- Whats the easist/most cost effective way to ground the system. The drawing has no info regarding this, and I dont have much experience grounding systems of this type,i.e.-With no Main breaker or switchgear. Any suggestions would be appreciated